Press Release April 2017

How to save Capex on Substation Upgrades

Figure 1 – NOJA Power OSM Recloser Substation Mounting Arrangement, Eugene Oregon USA

Figure 1 – NOJA Power OSM Recloser Substation Mounting Arrangement, Eugene Oregon USA

6 April 2017 - In modern society, the reliable and abundant supply of electricity for mass consumers is often taken for granted. The industry in charge of supplying the end consumers is often under significant scrutiny for expenses, particularly in government owned enterprises.

Press Release January 2017

USA Substation Makeover

Four outgoing feeders at 20kV, One NOJA Power OSM Recloser per Feeder

Four outgoing feeders at 20kV, One NOJA Power OSM Recloser per Feeder

4 January 2017, Eugene OR – In the latest of network augmentation works planned for the Emerald People’s Utility District, EPUD has procured, deployed and commissioned NOJA Power’s OSM series reclosers for the replacement of aging network assets. EPUD has completely overhauled their Elmira Substation with the replacement of all four outgoing circuit breakers with NOJA Power OSM Reclosers.

Press Release August 2013

NOJA Power remote RC10 cubicle HMI panel improves operator comfort and safety

NOJA Power’s RC10 cubicle remote HMI panel

NOJA Power’s RC10 cubicle remote HMI panel centralises the control and configuration of all of a substation’s automatic circuit reclosers in a climate-proof room.

Electrical switchgear engineers NOJA Power today announces the availability of a remotely-mounted HMI panel connected by fibre optic cable to the RC10 cubicle used to control an OSM range Automatic Circuit Recloser (ACR). The remote panel option allows operators to configure several ACRs from a single 19-in rack in a safe and climate-proof control room.